Breathing façade instead of ventilation system
Renovation of Kreishaus Siegen
- Technical renovation
- Removal of induction air conditioning
- Window ventilation instead of mechanical ventilation
- Improvement of fire protection
- Renovation of the windows and insulation of the façade
- Desired outcome: Cost-effective revitalization of model character
Which façade for a high-rise building?
SAVINGS | |
---|---|
Power | 72% (annually) |
Heat | 72% (annually) |
CO2 | 1.600 tons or 65% (annually) |
- Power demand and peak load dropped sharply
- Energy certificate in new construction quality
- Primary energy requirement 31% better
- Building shell 57% better
Participants
Kreis Siegen-Wittgenstein
gmp Architekten, Aachen
gpa Goebel Projektsteuerung Airport Consulting, Münster
Ebert Ingenieure, Nürnberg u. Düsseldorf
KonTec Fassadenplanung, Dormagen
Fassadenlüfter FSL GmbH & Co. KG, Neukirchen-Vluyn